Feasibility Study
In 2023, the City of Homer and the USACE signed a Federal Cost Share Agreement (FCSA) to advance a Homer Harbor Expansion Study. The cost share agreement is a contractual arrangement between the City and USACE to help share costs and resources. The 5-year feasibility study, led by USACE, will help determine whether it is technically feasible and financially viable to expand the harbor.
The study involved developing and analyzing design alternatives, evaluating economic and environmental impacts, and encouraging community input to address benefits, risks, and concerns.
The City is committed to delivering a robust public engagement process to ensure that the input and ideas of the diverse Homer community are considered and reflected in the development of the design alternatives. Visit the Get Involved page for details.
To view the Draft Feasibility Study and all appendices, click on “Draft Feasibility Study Documents” below.
Draft Feasibility Study Documents - Click to view
- 01 Homer Draft Feasibility Report
- 02 Appendix A Hydraulics and Hydrology
- 03 Appendix B Geotechnical
- 04 Appendix B Attachment A Geotechnical Data Report
- 05 Appendix B Attachment B 2017 Deep Water Rock Report
- 06 Appendix B Attachment C Seismic Design Parameters
- 07 Appendix B Attachment D Slope Stability Results
- 08 Appendix B Attachment E Liquefaction Analysis
- 09 Appendix B Attachment F Geophysical Report
- 10 Appendix C Economics
- 11 Appendix D Cost
- 12 Appendix E Correspondence
- 13 Appendix F Homer Real Estate Plan
- 14 Appendix G 404(b)(1) Check List
- 15 Appendix H Essential Fish Habitat Assessment
- 16 Appendix H Attachment EFH Mapper Report
- 17 Appendix I Biological Assessment
- 18 Appendix I Attachment 1 ESWG Meeting Minutes (August 23, 2023)
- 19 Appendix J FWS CAP Planning Aid Letter
- 20 Appendix K Finding of No Significant Impact (FONSI)
- 21 Appendix L Environmental Stakeholder Working Group
- 22 Appendix M Eel Grass Mitigation Assessment
- 23 Appendix N Draft DMMP
- 24 Appendix O Ecological Model
- 25 Appendix O Attachment 1 Kachemak Bay Submerged Aquatic Vegetation Model
- 26 Appendix O Attachment 2 Workshop Attendance Sheet
- 27 Appendix O Attachment 3 Workshop Agenda
- 28 Appendix O Attachment 4 Ecological Model Workshop Follow-up Meeting Minutes (June 30, 2025 & July 11, 2025)
- 29 Appendix P Fieldwork
- 30 Appendix P Attachment 1 Aquatic Resource Permit Documentation
- 31 Appendix P Attachment 2 Sampling Analysis Plan and Results
- 32 Appendix P Attachment 3 Fieldwork Summary
Growing Harbor Demand
A combination of increased demand, larger vessels, and safety concerns has prompted the City to thoroughly examine the current and future needs of Homer’s Port and Harbor for a better tomorrow:
- Demand for moorage exceeds the harbor’s capacity, and nearly 400 small and medium vessels are on the harbor’s stall wait list.
- Between 2008 and 2018, the local fishing fleet grew by more than 42 percent. Since 2022 alone, harbor use by research, cargo, pleasure, tug and military vessels increase from 16% for tugs to 44% for research vessels.
- Large marine transportation vessels and commercial fishing vessels are currently being moored three abreast due to space limitations,
- vessel sizes are increasing, with lengths that exceed the harbor’s largest stalls and drafts that exceed the present harbor’s depth, preventing harbor entry.
Expanding the harbor will help keep the region’s economy diversified and strong by meeting today’s needs, promoting good job opportunities in the marine trades and support sectors, and positioning Homer Harbor to flexibly meet future needs.
What’s Next
The planning process advances along two coordinated tracks: (1) City of Homer HHE Execution and (2) USACE HHE Execution as illustrated in the graphic at the left. The scoping and opportunity appraisal phases began in May 2023. The subsequent alternatives evaluation and analysis phase began in September 2023 and concluded in April 2026 after incorporating seismic design requirements, advancing alternatives to 35% design and identifying a Tentatively Selected Plan.
Public engagement has been an integral part of this process, ensuring that alternatives were developed and refined in a manner that considers and reflects community needs.
In May 2026, USACE released the Draft Feasibility Report and Environmental Assessment for public and agency review and comment. Following the public comment period, the study team is evaluating and responding to comments while refining the recommended plan. The study has also successfully confirmed with USACE leadership the technical viability and support to advance the preferred alternative. The project anticipates issuing a final Chief’s Report in March 2027. The Chief’s Report will serve as the basis for congressional authorization and future implementation of the project.
The City’s next step will be developing and refining the local service facilities (LSFs) based on the authorized plan. This includes new float systems, gangways, electrical utilities, fuel dock, and other portions of the moorage basin infrastructure.
Mission
Work collaboratively with all segments of the community to explore opportunities to expand necessary infrastructure while ensuring Homer’s maritime future, navigational safety, environmental integrity, and regional connectivity. Align the development of any opportunities with the City of Homer Port and Harbor Department Mission Statement.
Vision
Recognizing Homer’s unique environmental setting and our common love to live, work, and play here, we will enhance Homer’s maritime opportunities in a fiscally, environmentally, and socially responsible manner for the benefit of all.
Charter Document
Study planning activities began with the City of Homer in the spring of 2023, including the draft of a Charter Document at a joint public work session with the Homer City Council and Port and Harbor Advisory Commission. The document outlines a shared vision, goals, objectives, and success factors for the City’s involvement in the Homer Harbor Expansion study. View the Charter Document, which was adopted by Resolution at the Homer City Council’s June 12, 2023, meeting.