Initial 2023 USACE Design Alternatives

Your feedback is helping to make this project a success!

    The Homer Harbor Expansion Study initial array of alternatives were rolled out at a public meeting on September 23, 2023; below you’ll find the rating criteria against which the alternatives were measured and either screened out or moved forward for further analysis. The refined alternatives were available in March and April, 2025 for public review and comment.

      You are on our mobile alternatives site.  The tables presented here is large and requires scrolling and is best viewed at 100%  on a laptop, desktop or tablet.

        +

        Alternative 1A

        A single enclosed basin where the outer breakwaters of the enclosure create no additional room for local service facilities on the top surface area.

        Learn more!

        Alternative 1B

        A single enclosed basin where the outer breakwaters of the enclosure have some room for local service facilities on the top surface area.

        Learn more!

        Alternative 1C

        An enclosed T-shape harbor where the outer breakwater of the enclosure have some room for local service facilities on the top surface area.

        Learn more!

        Alternative 1D

        A crescent shape enclosed basin where the outer breakwaters of the enclosure have maximum room for local service facilities on the top surface area. Access to basin connects to Spit away from existing harbor.

        Learn more!

        Alternative 2

        A basin protected by a breakwater that is detached from the shore, creating a tranquil harbor space.

        Learn more!

        Initial Alternative Screening: Alternatives Carried Forward

        All US Army Corps of Engineers alternatives below assume that minimum local service facilities will be avaliable as well as meet the needs for both small and large boats.

        Alternatives

        Alternatives Description

        Location

        Accommodating Current Needs / Future Fleets

        Completeness: Necessary actions accounted for

        Effectiveness: How well does it meet the goals and objectives

        Efficiency: What is the cost benefit

        Acceptability: Does it meet the regulations and requirements

        Implementability: Is implementation practical

        Satisfaction: How satisfied will the stakeholders be

        ALTERNATIVE 1A:

        A single enclosed basin where the outer breakwaters of the enclosure create no additional room for local service facilities on the top surface area.
        East side of Spit adjacent to existing harbor
        Current + Future Needs
        High
        Medium
        Medium
        High
        Yes
        High
        ALTERNATIVE 1B:

        A single enclosed basin where the outer breakwaters of the enclosure have some room for local service facilities on the top surface area.
        East side of Spit adjacent to existing harbor
        Current Needs + Future Fleet
        High
        High
        Medium
        High
        Yes
        High
        ALTERNATIVE 1C:

        An enclosed T-shape harbor where the outer breakwater of the enclosure have some room for local service facilities on the top surface area.
        East side of Spit adjacent to existing harbor
        Current Needs + Future Fleet
        High
        High
        Medium
        Medium
        Yes
        High
        ALTERNATIVE 1D:

        A crescent shape enclosed basin where the outer breakwaters of the enclosure have maximum room for local service facilities on the top surface area. Access to basin connects Spit away from existing harbor.
        East side of Spit adjacent to existing harbor
        Current Needs + Future Fleet
        High
        High
        Low
        Low
        No
        Medium
        ALTERNATIVE 2:

        A basin protected by a breakwater that is detached from the shore, creating a tranquil harbor space.
        East side of Spit adjacent to existing harbor
        Current + Future Needs
        High
        Medium
        Medium
        High
        Yes
        High

        Initial Alternative Screening: Alternatives NOT Carried Forward

        All US Army Corps of Engineers alternatives below assume that minimum local service facilities will be avaliable as well as meet the needs for both small and large boats.

        Alternatives
        Alternatives Description
        Location
        Accommodating Current Needs / Future Fleets
        Completeness: Necessary actions accounted for
        Effectiveness: How well does it meet the goals and objectives
        Efficiency: What is the cost benefit
        Acceptability: Does it meet the regulations and requirements
        Implementability: Is implementation practical
        Satisfaction: How satisfied will the stakeholders be
        ALTERNATIVE 3A:

        An enclosed harbor where the outer breakwaters of the enclosure are floating breakwater structures. Creates minimal room for local service facilities on the top surface area.
        East side of Spit adjacent to existing harbor
        Current + Future Needs
        High
        Low
        Low
        High
        No
        High
        ALTERNATIVE 3B:

        An enclosed harbor where the outer breakwaters of the enclosure are a combination of floating and non-floating breakwater structures; creates some room for local services facilities on the top surface area.
        East side of Spit adjacent to existing harbor
        Current + Future Needs
        High
        Low
        Low
        High
        No
        High
        ALTERNATIVE 4:

        Excavation of some of the uplands around the existing harbor to make more room for boats.
        Within existing harbor
        N/A
        Low
        Low
        Low
        Low
        No
        Low
        ALTERNATIVE 5A:

        Creating a new harbor at Diamond Creek.
        Off Spit, near Diamond Creek
        Current Needs + Future Fleet
        Low
        Low
        Low
        Low
        No
        Low
        ALTERNATIVE 5B:

        Creating a new harbor east of the Homer Airport.
        Off Spit, east of Homer Airport
        Current Needs + Future Fleet
        Medium
        Medium
        Low
        Low
        No
        Low
        ALTERNATIVE 5C:

        Creating a new harbor in Seldovia.
        Off Spit, Seldovia
        Current Needs + Future Fleet
        Low
        Low
        Low
        Low
        No
        Low
        ALTERNATIVE 6:

        Reconfigure existing harbor for large vessels; build new harbor for small boats on outside of existing harbor.
        East side of Spit adjacent to existing harbor
        Current Needs + Future Fleet
        Low
        Low
        Medium
        Low
        No
        Medium
        ALTERNATIVE 7:

        Rearranging the dock floats inside the harbor.
        Within existing harbor
        Current Needs
        Low
        Low
        Low
        Medium
        No
        Low
        Loading...